hi all just to let you all no how im getting on with the building work were i had dug out for the footing for the wall was not deep enuff so i had to dig depper as the wall woould not run level on the top so digging started again utill i hit concret wich was not even a foot from were i was so the wall carnt be built cos it is the old street from b4 they built the new houses but as i ahve all the bricks its going round the back rather than the side . any ways the dog run is going to be at the top end of the drive and will only be 13 foot now not 15 these things are sent to try us lol
beedham3k4
beedham3k4

Number of posts : 122
Age : 43
Location : yorkshire
Reputation : 0
Points : -3
Registration date : 2008-03-18

Back to top Go down

building work Empty Re: building work

Post by engladian Sat May 10, 2008 9:24 pm

Oh no, terrible when you think you have it all figured out and a spanner gets thrown into the works. More muscle building digging ahead then.
engladian
engladian
Admin Team
Admin Team

Number of posts : 815
Age : 62
Location : Kent
Reputation : 0
Points : -6
Registration date : 2008-01-31

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum